Initial production costs
Jump to navigation
Jump to search
Label: | Initial production costs |
Description: | The costs of energy conversion technologies at the start of the simulation. |
Dimensions: | region |
Default unit: | $/GJ |
Variable type: | external parameter |
Values based on: | Various sources |
External parameter is input of model component(s):
![](/images/diagrams/Diagrams_ae7e54003e14110b714d9356c8ed4f2e.png)
- Click on a box to open the model component.