Initial production costs

From IMAGE
Revision as of 17:26, 29 April 2014 by DetlefvanVuuren (talk | contribs)
Jump to navigation Jump to search
Label: Initial production costs
Description: The costs of energy supply technologies at the start of the simulation.
Dimensions: region
Default unit: $/GJ
Variable type: external parameter
Values based on: Various sources




External parameter is input of model component(s):


  • Click on a box to open the model component.