Energy conversion/Description: Difference between revisions

From IMAGE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 32: Line 32:
The cost of one unit electricity generated is equal to the sum of the capital cost, operational and maintenance costs (O&M), fuel cost, and CO<sub>2</sub> storage cost.
The cost of one unit electricity generated is equal to the sum of the capital cost, operational and maintenance costs (O&M), fuel cost, and CO<sub>2</sub> storage cost.


See the additional info on [[Grid and infrastructure]] and  [[Carbon Capture and Storage (CCS)]].
See the additional info on [[Grid and infrastructure]] and  [[Carbon capture and storage]].


====Solar and wind power====
====Solar and wind power====

Revision as of 10:13, 23 September 2015