Energy conversion/Data uncertainties limitations: Difference between revisions
Jump to navigation
Jump to search
Oostenrijr (talk | contribs) No edit summary |
Oostenrijr (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{ComponentDataUncertaintyAndLimitationsTemplate | {{ComponentDataUncertaintyAndLimitationsTemplate | ||
|Reference=Hendriks et al., 2004b; Van Ruijven et al., 2007; WEC, 2010; MIT, 2003; IRENA, 2016; De Boer and Van Vuuren, | |Reference=Hendriks et al., 2004b; Van Ruijven et al., 2007; WEC, 2010; MIT, 2003; IRENA, 2016; De Boer and Van Vuuren, 2017; Pietzcker et al., 2017; Luderer et al., 2017; | ||
|Description=<h2>Data, uncertainties and limitations</h2> | |Description=<h2>Data, uncertainties and limitations</h2> | ||
===Data=== | ===Data=== | ||
Line 23: | Line 23: | ||
<tr><td>Performance of fossil fuel and bio-energy fired plants | <tr><td>Performance of fossil fuel and bio-energy fired plants | ||
</td> | </td> | ||
<td>Hendriks et al. ([[Hendriks et al., 2004a|2004a]]), various sources described in De Boer and Van Vuuren ([[De Boer and Van Vuuren, | <td>Hendriks et al. ([[Hendriks et al., 2004a|2004a]]), various sources described in De Boer and Van Vuuren ([[De Boer and Van Vuuren, 2017]]) | ||
</td></tr> | </td></tr> | ||
<tr><td>{{abbrTemplate|CCS}} plants and storage | <tr><td>{{abbrTemplate|CCS}} plants and storage | ||
Line 39: | Line 39: | ||
<tr><td>Solar and wind costs | <tr><td>Solar and wind costs | ||
</td> | </td> | ||
<td>Various sources described in De Boer and Van Vuuren ([[De Boer and Van Vuuren, | <td>Various sources described in De Boer and Van Vuuren ([[De Boer and Van Vuuren, 2017]]) | ||
</td></tr> | </td></tr> | ||
<tr><td>Nuclear power - technology and resources | <tr><td>Nuclear power - technology and resources | ||
Line 56: | Line 56: | ||
<div class="version changev31"> | <div class="version changev31"> | ||
The two main uncertainties are calculation of future energy conversion relating to development rates of the conversion technologies, and the consequences for the electricity system of a high level of market penetration of renewable energy. | The two main uncertainties are calculation of future energy conversion relating to development rates of the conversion technologies, and the consequences for the electricity system of a high level of market penetration of renewable energy. | ||
TIMER electric power generation submodule has been tested for different levels of market penetration of renewable energy ([[De Boer and Van Vuuren, | TIMER electric power generation submodule has been tested for different levels of market penetration of renewable energy ([[De Boer and Van Vuuren, 2017]]; [[Pietzcker et al., 2017]]; [[Luderer et al., 2017]]). The model was shown to reproduce the behaviour of more detailed models that describe electricity system developments. | ||
</div> | </div> | ||
===Limitations=== | ===Limitations=== | ||
<div class="version changev31"> | <div class="version changev31"> | ||
The model describes long-term trends in the energy system, which implies that the focus is on aggregated factors that may determine future energy demand and supply. However in energy conversion, many short-term dynamics can be critical for the system, such as system reliability and ability to respond to demand fluctuations. These processes can only be represented in an aggregated global model in terms of meta-formulations, which implies that some of the integration issues regarding renewable energy are still not addressed. A more detailed discussion on the model limitations can be found in De Boer and Van Vuuren ([[De Boer and Van Vuuren, | The model describes long-term trends in the energy system, which implies that the focus is on aggregated factors that may determine future energy demand and supply. However in energy conversion, many short-term dynamics can be critical for the system, such as system reliability and ability to respond to demand fluctuations. These processes can only be represented in an aggregated global model in terms of meta-formulations, which implies that some of the integration issues regarding renewable energy are still not addressed. A more detailed discussion on the model limitations can be found in De Boer and Van Vuuren ([[De Boer and Van Vuuren, 2017]]). | ||
</div> | </div> | ||
Another limitation is the formulation of primary fossil-fuel conversions in secondary fuels. TIMER currently does not include a module that explicitly describes these processes. | Another limitation is the formulation of primary fossil-fuel conversions in secondary fuels. TIMER currently does not include a module that explicitly describes these processes. | ||
}} | }} |
Revision as of 09:02, 13 June 2018
Parts of Energy conversion/Data uncertainties limitations
Component is implemented in: |
|
Related IMAGE components |
Projects/Applications |
Models/Databases |
Key publications |
References |